Design & development
A style starts as a photo, a sketch or a tech pack. Between that and a garment that can run on a flat-knitting machine sits the design room: choosing the structure, the gauge and the yarn, costing it against your target, and returning a measurement sheet you can sign off.
Design here is not styling for a lookbook. It is construction work: deciding how a garment is built so that the piece we sample is repeatable at your quantity and your price. That decision is made in our own design room, with the yarn on the table and the machines a floor away.
What you can send
You do not need a finished tech pack to get a quotation. Any one of these is enough to start:
- A tech pack with measurements, composition and colourways
- Reference photos, or a link to a product you want matched
- A physical sample — with or without a pattern
- A hand sketch and a target price
If the only thing you have is a picture, we will tell you what cannot be read from it — yarn count, exact gauge, trims — and what we would assume until you confirm it.
Structure, gauge and yarn are decided together
These three are not separate choices. A heavier gauge uses more yarn; a denser structure takes longer per panel; a softer yarn may not hold the stitch definition that looked right in the reference. The design team proposes a combination that reaches the look you want inside the cost you can sell at.
| Decision | What it changes | What we usually propose |
|---|---|---|
| Gauge | Surface density, hand-feel, yarn consumption | 12GG for core dresses and cardigans, 7GG for open-knit pieces, 3GG–5GG for chunky outerwear, 14GG–16GG for fine layering |
| Knit structure | Texture, stretch and time per panel | Rib, links-links, open knit, ladder stitch or jacquard, chosen against your reference |
| Yarn | Hand-feel, pilling, care label, price | Cotton, merino, cashmere blends, viscose, acrylic, recycled fibres |
| Trims & finishing | Neckline, placket, buttons, hem | Linked or hand-finished edges that match the sample you approve |
Costing against your target price
Every proposal is costed, not just described. We quote against your target and keep yarn, knitting time, trims and finishing visible, so you can see where the money goes. Where a construction is too expensive for the target, the answer is an alternative construction — a different gauge, a yarn with a similar hand at a lower price, a simpler trim — not a silent substitution after the order is placed.
Quotations go out within 48 hours of a tech pack or a reference.
Yarn sourcing and lab dips
Yarn is sourced through the mills in Changping and the wider Pearl River Delta that we buy from routinely, and lab dips are submitted for approval before knitting starts. Colour is approved on yarn, not on a screen, because that is the only place it matters.
What comes back to you
- A costed quotation within 48 hours
- A construction proposal: gauge, structure, yarn count, trims
- Yarn and colour lab dips for approval
- A graded measurement sheet to sign off
- A sample-room record that the bulk order is knitted against
How long each step takes
-
01
Within 48 hours
Inquiry & quotation
A tech pack, a photo or a sketch, plus your target price and quantity.
-
02
3–5 days
Tech pack & yarn
Gauge, yarn count and colour confirmed; yarn sourced and lab-dipped.
-
03
7–10 days per round
Sampling
First sample knitted in our own sample room, then revised until it is approved.
-
04
45–55 days
Bulk
Knitting, linking, washing, pressing and 100% final inspection.
Questions buyers ask
Can you develop a style from a photo alone?
Who owns the pattern and the tech pack?
Which yarns can you source?
Do you work as ODM as well as OEM?
Tell us the style and the target price. We quote in 48 hours.
Send a tech pack, a reference photo or a sketch — you will get a construction, a cost and an honest lead time back.