Production & finishing
Bulk is where a construction either holds or drifts. Knitting, linking, washing, pressing and inspection run in sequence in the same building, so a fault is caught at the step that caused it — and the garment that ships matches the sample you approved.
A knitwear garment passes through several hands: the machine knits panels, a linker joins them, then washing and pressing set the final hand-feel. When those steps sit in separate buildings, problems surface after the fact. Here they run in sequence on one site, and a fault is caught at the step that caused it.
The floor
Production runs on computerised flat-knitting machines across 3GG to 16GG. That range is what lets a 3GG chunky outerwear piece, a 7GG open-knit dress and a 16GG fine-gauge layer sit in the same programme instead of one of them going to another factory.
| Work area | What it does |
|---|---|
| Computerised flat knitting | 3GG, 5GG, 7GG, 12GG, 14GG, 16GG |
| Linking & hand-finishing | Panel joining, trims, hand work |
| Washing & pressing | Finishing and shaping |
| Inspection & packing | 100% final inspection, export cartons |
Machine counts and daily output are quoted per project — ask for the current numbers with your quotation.
Five checks between yarn and carton
Quality is not a final gate here. Each stage is checked before the next one starts, so nothing is discovered too late to fix.
-
01
Before knitting
Incoming yarn check
Yarn count, colour against the approved swatch, and lot consistency before a single panel is knitted.
-
02
Per style & colour
First-off approval
The first piece off the machine is measured against the approved spec sheet; production continues only once it passes.
-
03
During production
In-line inspection
Panels are checked for dropped stitches, oil marks and measurement drift while the order is running.
-
04
Every piece
100% final inspection
Every garment is inspected against AQL 2.5, with measurement checks per size before packing.
-
05
Before shipment
Packing & carton check
Carton marks, polybag and size ratio are verified against your packing list before the goods leave the factory.
Lead time, packing and shipping
Bulk takes 45–55 days after sample approval and yarn in house. Goods are packed to your carton marks, polybag and size ratio, then shipped FOB Shenzhen or Guangzhou — or door-to-door if you would rather we handled the freight.
- Bulk lead time: 45–55 days after sample approval and yarn in house
- Inspection: 100% final inspection against AQL 2.5, measurement checks per size
- Packing: to your carton marks, polybag and size ratio
- Terms: FOB Shenzhen / Guangzhou, or door-to-door
- Re-orders: knitted from the approved sample record — same yarn, same gauge, same measurements
Questions buyers ask
What is the bulk lead time?
How is quality checked?
Do you ship door-to-door?
Will a re-order match the first order?
Gauge, yarn, quantity, delivery window. Send what you have.
We will tell you what is realistic, and what the floor can commit to for your date.