A knitwear style goes through four stages: sketch, tech pack, sample, bulk. Each one looks like a design step, but each also fixes money. By the time a factory quotes, roughly four things are already doing most of the work on the price: gauge, yarn, the number of colours, and the labour a construction needs after knitting.
1. Sketch and brief
The brief does not have to be a drawing. A reference photo with the part you like marked, a competitor sample, or three sentences about the fabric are all workable starting points. What matters is that the factory can see where the garment sits: is it a fine layering piece or a chunky outer layer? Does it need to hold shape or drape?
Two numbers belong in the first conversation even if they are rough: your target FOB price and the quantity per colour. A quote built without them is a guess, and guessing is how sampling rounds multiply.
2. Tech pack
The tech pack is where cost becomes measurable. A useful knitwear tech pack contains:
- Flat sketches with construction notes (neckline, placket, seams, hem finish)
- Measurements per size, with points of measure marked
- Yarn composition, count and reference swatch
- Gauge — 3GG to 16GG — or a reference sample whose gauge can be counted
- Colour references, with Pantone numbers if you have them
- Trims: buttons, labels, hangtags, packing method
- Care and content wording for the label
If you only have half of this, send the half. Factories fill gaps every day; what they cannot fix is contradictory information. A measurement sheet that disagrees with the sketch will always cost a sampling round.
3. Sample
Sampling is fast here — 7–10 days for a first sample — but a sample is not only a fit check. It is the point where the yarn meets the machine, and hand-feel becomes real: a 12GG cotton rib reads differently on the body than the same construction in a cashmere blend.
Use the sample round to confirm four things: measurements, hand-feel, colour, and whether the construction survives normal wear. Revisions after that are usually small. Revisions that change gauge or yarn are a re-quote, not a revision.
Cost is decided by gauge, yarn, colour count and finishing minutes — not by the number of sketches.
4. Bulk
Bulk lead time is typically 45–55 days after sample approval and yarn in house. Yarn is often the hidden variable: a stock yarn in a standard colour can start immediately, while a dyed-to-match yarn adds a dye lot lead time and a minimum quantity per colour.
What to fix before bulk starts: approved sample, approved colour, packing list, carton marks and the shipping terms. Anything left open at that point becomes a change order, and change orders are where delivery dates slip.
Three numbers to send with your first email
Target price, quantity per style per colour, and the date you need goods in your warehouse. With those three, a factory can tell you honestly whether a style is achievable — and if not, which of the four cost levers to move.
Where the money actually goes
| Decision | Effect on cost |
|---|---|
| Gauge | Finer gauge means more needles, more minutes per panel; chunky knits use less yarn but heavier machines. |
| Yarn | Fibre is usually the largest single line: cashmere blends can multiply it several times over cotton. |
| Colour count | Each colour carries a yarn minimum and a dye lot, so colour is often costlier than quantity. |
| Hand finishing | Linking, embroidery and beadwork are labour minutes; they are visible in the price and in the lead time. |
None of this is secret, and none of it is specific to one factory. What a buyer should expect is a quotation that names the trade-offs out loud: this construction at this gauge in this yarn costs this much, and here is what changes if you move one of the four.